Full and partial renovations across Poole and Dorset: rooms reconfigured, walls out and steels in, new kitchens and bathrooms, rewires and replumbs coordinated, plaster, floors and decoration. Older properties in this part of the world have their own habits, damp in solid walls, tired flat roofs, and layouts that made sense in 1935. We fix the fabric first and the finishes second, so the money you spend on the pretty end is not sitting on top of a problem.
Free quotes · Fully insured · One team, start to finish

Walls removed, openings widened, kitchens moved and rooms reshaped, with the structure engineered and signed off properly.
Damp, roofs, gutters and pointing sorted first, so the new plaster and the new kitchen are not going onto a house that is still wet.
The wet rooms handled in-house, from moving the soil route to the last row of tiles, sequenced with the rest of the build.
Building, plumbing and the trades we bring in run under one programme and one number, from strip-out to the final coat.
Outside and at the top: roof, gutters, pointing, ground levels and any damp. Until the house is dry, money spent on plaster, kitchens and floors is money at risk. It is not the exciting end of the job, but doing it in that order is what stops you paying for the same room twice, and we will give you an honest view of what the fabric needs before anything else is quoted.
Yes, and the answer is very often not chemical injection. Older solid-walled houses in Dorset get damp from raised ground and path levels, failed pointing, blocked or leaking gutters, and modern non-breathable finishes trapping moisture in walls that were built to breathe. Fix those causes and the house dries out. We look for the cause rather than selling you a treatment.
Yes, and it is a sensible way to do it when the budget will not stretch to everything at once. The order matters though: fabric and structure first, then services, then spaces, then finishes. A staged renovation done in the right order costs less overall than one done in the wrong order, even though it feels slower.
Old houses always hold a few surprises. The difference is how they are handled. We flag known risks as provisional sums in the original quote, show you what we have found with photos, and price it before touching it. You should never open an invoice and find something on it you had not agreed.
It depends on the scope. Room-by-room and floor-by-floor work is very liveable and we programme it that way when you need it. A full strip-out with floors up and ceilings down is genuinely miserable to live in, and moving out for those weeks usually works out cheaper than the alternative once you count the time lost. We will tell you which one yours is.
Call, WhatsApp or send the form and we will come back the same day. No obligation, just straight answers and a fair price.