Most full bathroom renovations in Bournemouth take two to three weeks on site. The real answer depends on what is behind your old tiles and how much you want to change. Here is how the time breaks down, stage by stage, so you can plan for the weeks without your bathroom.
For a typical family bathroom where the bath, toilet and basin stay roughly where they are, expect around 10 to 15 working days from strip out to finish. Moving the toilet, switching to a walk-in shower or building a fully tanked wet room usually takes 15 to 20 working days. That is because of the extra pipework, changes to the floor and drying time.
That is just the time on site. Before work starts, allow two to six weeks to choose and order tiles, sanitaryware and furniture. Made-to-measure vanity units and some imported tiles can take longer. It is far better to have everything delivered and checked before the old suite comes out.
A realistic schedule for a standard refit looks something like this:
Silicone sealant normally needs 24 hours to set before the shower is used. So your first proper wash is often the day after the last fitting.
Much of the housing in Boscombe, Southbourne, Winton and Westbourne is Victorian or Edwardian. Older bathrooms there often hide surprises: lath and plaster walls, joists that are notched or rotten under a leaking toilet, lead or iron pipes, and uneven floors that need levelling before tiling. Each of these can add one to three days. A 1930s semi in Kinson or Moordown, or a newer home in Littledown, is usually more predictable.
There are a lot of flats in Bournemouth, especially near the town centre and the seafront. If you live in one, check your lease and speak to the managing agent early. Many want written consent before plumbing work, limit noisy work to set hours or ask for communal areas to be protected, and all of that affects the schedule.
If the skip has to go on the road, you need a permit from BCP Council. On busy streets or in permit parking zones, it can take a few working days to arrange.
Replacing a bathroom like-for-like rarely needs building regulations approval, but some parts of the job may. A new circuit, for example for an electric shower, should be done by a registered electrician who can certify the work under Part P. A new extractor fan must meet ventilation standards, and changing the drainage can come under building regulations. None of this usually adds much time, as long as it is planned from the start rather than discovered halfway through.
Most delays come from late decisions and missing parts, not the work itself. A few simple steps make a real difference.
Yes, most people do. If it is your only bathroom, plan to shower elsewhere for most of the job, and ask your builder whether the toilet can be temporarily reconnected at the end of each day.
No, refitting a bathroom inside your home does not need planning permission. Listed buildings are the exception, and flats usually need the freeholder's or managing agent's consent under the lease.
Usually 24 hours after the final sealant goes on. If the floor has been tanked or screeded, drying time for that should already be built into the schedule earlier on.